Availability: | |
---|---|
Quantity: | |
ASP2630
PERFLEX
Polyaspartic Polyurea High Solid Elastic Waterproof Coating - ASP2630 is a top-grade coating composed of aspartate resin, a variety of pigments and fillers, auxiliary agents, and solvents. Its curing process involves a polyether modified isocyanate, enhancing its overall effectiveness and durability. It is primarily intended for waterproofing and anti-corrosion treatment of concrete substrates.
MAIN FEATURES
Thick film construction, one-time film formation is larger than 500μm
Excellent adhesion to concrete substrates
Excellent elongation at break and tensile strength
Simple construction and quick drying
APPLICATION LAYERS
ASP2630 Polyaspartic Polyurea High Solids Elastic Waterproof Coating: A top coat layer that provides excellent waterproofing and anti-corrosion treatment.
EPR3101 Solvent-Free Epoxy Primer (0.15-0.2mm): A base layer that ensures strong adhesion to the concrete.
Concrete: The foundational layer of the flooring system.
APPLICATION SCENARIOS
Polyaspartic Polyurea High Solid Elastic Waterproof Coating ASP2630 is primarily intended for waterproofing and anti-corrosion treatment of concrete substrates. Its versatile formulation makes it ideal for a range of environments including basements, bridges, roofs, warehouses, and water parks. Additionally, it is suitable for foam, plastic, and other substrates, making it a go-to solution for diverse waterproofing needs.
PHYSICAL PARAMETERS
Main Agent | Curing Agent |
Appearance: All colors liquid | Appearance: All colors liquid |
Flash point (℃): 70 | Flash point (℃): 38 |
Specific gravity (g/cm3): 1.45±0.05(A) | Specific gravity (g/cm3): 1.04±0.04(B) |
Viscosity: Facade construction:≧20000; Flat construction: 1000-3000 | |
Weight solids (A/B mix): 93±2% | |
Mixing specific gravity (g/ml): 1.20±0.05 | |
Gloss: glossy | |
Coating film thickness: Dry film: 500-600 Wet film: 450-550μm | |
Theoretical coating rate: | |
Theoretical value: 1.32kg/mm/m2 | |
Actual value: related to surface treatment, external environment, construction method and other factors |
Material properties after curing | |
Elongation | ≧300% |
Tensile strength | ≧10MPa |
Tear strength N/mm | ≧45 |
Adhesion (concrete): | ≧2.5 MPa |
Low temperature bendability (-35℃) | No crack |
Construction Parameters:
Use ratio:
Brushing:A:B = 1: 1 mass ratio(please stir well before use)
Application time:
Temperature(℃) | 5 | 10 | 20 | 30 |
Pot life (mins) | 80-90 | 60-80 | 40-60 | 30-40 |
Construction conditions:
Ambient temperature: 5℃-30 ℃, Ambient humidity: ≤85%
Substrate temperature: must be greater than the air dew point temperature 3 ℃ or more.
Roll coating or first spray and then roll (recommended), if using air spray or roller coating, etc., please consult our engineers before use.
Cleaning agent: polyaspartic polyurea standard thinner
Drying time and painting interval:
| 5 | 10 | 20 | 30 |
Dry to the touch (hrs) | 4 | 3 | 2 | 1.5 |
Dry to handle (hrs) | 20 | 15 | 12 | 10 |
Dry to recoat | 20 | 15 | 12 | 10 |
CLICK HERE TO DOWNLOAD TDS&MSDS